GETTING STARTED  
ELECTRIC SYSTEM OPERATION  
Level 1 Charging (120V — Requires NEMA 5–15 Outlet)  
Level 1 charging is done by using a conventional 120Volt AC (Alternating Current)  
grounded receptacle along with the NEMA 5–15 ElectricVehicle Supply Equipment  
(EVSE) that comes standard with your vehicle. Refer to “Vehicle Charging Cord” for fur-  
ther information.  
Level 2 Charging (240V — Requires A 40 Amp Circuit Breaker Or  
Greater)  
Level 2 charging is accomplished by using  
240V permanently mounted EVSEs and is  
the preferred method for charging your  
vehicle.  
A Level 2 charging station can be installed  
at your residence.  
The Level 2 unit and installation service is  
available for purchase at your authorized  
studio.  
Charge Times  
Type of Charge  
Approximate Time  
Approximately 23 hours to fully recharge  
* 3 hours will restore 10 miles of range *  
Level 1 (120V/15A)  
Approximately 4 hours to fully recharge  
* 30 minutes will restore 10 miles of range *  
Level 2 (240V/30A)  
The following factors determine how long a battery recharge will take:  
The battery’s current state of charge (percent depleted)  
What recharging device is being used (Level 1 or Level 2)  
Ambient temperatures  
13  
Downloaded from www.Manualslib.com manuals search engine  
GETTING STARTED  
NOTE:  
Charging times are estimates based on a completely discharged high voltage battery pack.  
Charging times will vary based on the age, condition state of charge and temperature of  
the high voltage battery pack.  
EVSE Operation And Status Information  
Indicator  
Description  
Green indicates READY  
RED Indicates a fault  
1 — AC Indicator LED  
Green indicates READY  
RED indicates a fault  
2 — Fault Indicator LED  
All ON indicates system ready and not  
charging  
LED's turning on and off in sequence indi-  
cates vehicle charging  
3 — Charge Level Indicator LED's  
When the EVSE is first plugged in it will go through an initialization and self test. For the  
first three seconds after plugging in your EVSE all the LED's will remain off.  
After approximately three seconds the EVSE performs an internal self test and Ground  
Continuity Test.This process takes approximately six seconds.  
During the internal self test the unit turns on one Charge Level Indicator LED every 1.5  
seconds until all the Charge Level Indicator LED's are illuminated.  
14  
Downloaded from www.Manualslib.com manuals search engine  
GETTING STARTED  
Fault Indicator  
AC LED  
Charge Level Indicator LED's  
Time  
LED  
o
o
o
o
o
o
1.5 sec  
3.0 sec  
4.5 sec  
6.0 sec  
If the self test is successful the AC LED, the Fault Indicator LED and the four Charge  
Level LED's will turn solid green.  
The EVSE LED's will be used to indicate the vehicle's connection status if no faults are  
found during the self test.  
Fault Indicator  
AC LED  
Charge Level Indicator LED's  
LED  
After the EVSE is connected to the vehicle's charge inlet the EVSE will continue to illumi-  
nate all LED's green.  
Once the vehicle begins charging the EVSE Charge level LED's will illuminate in order  
from left to right, then shut off.This pattern will repeat as long as the EVSE remains con-  
nected to AC power and the battery is charging.  
The LED's are illuminated and turn off at the rate of one change per second.  
Fault Indicator  
AC LED  
Charge Level Indicator LED's  
Time  
LED  
o
o
o
o
o
o
1.0 sec  
2.0 sec  
3.0 sec  
4.0 sec  
NOTE:  
Refer to the Level 1 User Manual for any additional information on its use or operation.  
CAUTION!  
Do not bend or damage the Level 1 EVSE terminals as this could cause the EVSE to be-  
come inoperative and/or illuminate the fault LED.  