XANTIA - XM
CHECKS AND ADJUSTMENTS - 4 HP 18 AUTOMATIC GEARBOX
Engines : RFV - RGX - P8C
Checks - Adjustments : Kick down cable
Preliminary conditions :
- Engine hot.
- Idling speed correct.
- Cable routing correct
Accelerator cable adjustment :
- Remove the kick down cable from the drum.
- Pull out the sleeve stop (1) and fit the spring clip (2) so as to obtain a small
clearance at «a».
Kick down cable adjustment :
- Pull out the cable until the start of the kick down command, the lug (3) should be
at: X = 39 mm from the end of the sleeve.
- The lug (3) should then be positioned and crimped on the cable.
- Refit the kick down cable on the drum.
- Adjust the clearance (B) from 0.5 mm to 1 mm max. by tightening the nuts (4).
B2CP35DC
B2CP35CC
B2CP013C B2CP35EC
198