Advertisement

Advertisement

Removing and installing engine -> 1.1.2 Notes on installing for Your Volkswagen Touareg SUV First Generation (2002-2010)

Touareg 2003 ➤  
8-cylinder injection engine - Edition 11.2011  
– Attach lifting tackle -3033- as shown in illustration and lift en‐  
gine from scissor-type assembly platform using workshop  
crane -VAS 6100- .  
– Lift engine using workshop crane -VAS 6100- until the centre  
of the flywheel is at the same height as the assembly plate of  
the engine and gearbox support -VAS 6095- . Then bolt sup‐  
port to cylinder block as shown in the illustration using univer‐  
sal fastening elements.  
lk  
1.1.2  
Notes on installing  
Note  
When fitting engine and gearbox to body, it is essential to position  
engine carrier against body with the aid of scissor-type assembly  
platform -VAS 6131- . »Pulling up« engine carrier with securing  
bolts will damage threads.  
Procedure  
Install in reverse order. In the process, note the following:  
When the engine has been separated from the gearbox:  
– Check whether dowel sleeves for centring engine/gearbox are  
in cylinder block and install if necessary ⇒ 5-speed automatic  
gearbox 09D, four-wheel drive; Rep. gr. 37 ; Removing and  
installing gearbox .  
If subframe with engine carrier has been removed from assembly  
platform:  
10  
Rep. gr.10 - Removing and installing engine  
Touareg 2003 ➤  
8-cylinder injection engine - Edition 11.2011  
– Reposition subframe with engine carrier onto prepared as‐  
sembly platform.  
– Set engine on subframe.  
If gearbox is not yet bolted on:  
– Support engine from below using support -VAS 6131/8- .  
– Before installing assembly, install exhaust manifold with cat‐  
alytic converters to engine.  
Caution  
When doing any repair work, especially in the engine compart‐  
ment, pay attention to the following due to the cramped condi‐  
tions:  
♦ Route all the various lines (e.g. for fuel, hydraulics, acti‐  
vated charcoal filter system, coolant, refrigerant, brake  
fluid and vacuum) and electrical wiring in their original po‐  
sitions.  
♦ To avoid damage to lines, ensure sufficient clearance to  
all moving or hot components.  
Vehicles with automatic gearbox  
– When installing engine, first raise scissor-type assembly plat‐  
form only sufficiently to clip selector lever cable in position.  
lk  
– Reconnect all electrical connections, lines, hoses and con‐  
nectors which were separated during removal.  
– Top up ATF level ⇒ 5-speed automatic gearbox 09D, four-  
wheel drive; Rep. gr. 37 ; Checking ATF level and topping-  
up .  
– Reconnect air conditioning lines: ⇒ Heating, air conditioning  
system; Rep. gr. 87 ; Repairing components of refrigerant cir‐  
cuit .  
– Recharge air conditioning system with refrigerant: ⇒ Heating,  
air conditioning system; Rep. gr. 87 ; Repairing components  
of refrigerant circuit .  
– Replenish oil in power-assisted steering: ⇒ Running gear,  
axles, steering, front and four-wheel drive; Rep. gr. 48 ;  
Checking power-assisted steering system oil level .  
– Replenish coolant ⇒ page 86 .  
– Replenish engine oil if necessary.  
– Connect battery.  
Note  
Perform wheel alignment after the installation of subframe ⇒  
Running gear, axles, steering, front and four-wheel drive; Rep.  
gr. 44 ; Wheel alignment .  
– Connect Vehicle diagnosis, testing and information system -  
VAS 5052- .  
– Carry out vehicle system test ⇒ Vehicle diagnostic tester „Gui‐  
ded fault finding“.  
– Finish the vehicle system test so that any fault entries stored  
during assembly can be deleted automatically.  
1. Removing and installing engine  
11  
Touareg 2003 ➤  
8-cylinder injection engine - Edition 11.2011  
– Generate the readiness code in combination with a road test.  
Observe applicable safety precautions during road test.  
– Carry out road test.  
– Then carry out vehicle system test again and rectify any faults  
which may have occurred.  
Specified torques  
lk  
Threaded connection  
Bolts, nuts  
Specified torque  
10 Nm  
M6  
M7  
15 Nm  
M8  
25 Nm  
M10  
M12  
40 Nm  
60 Nm  
Deviations  
Engine bracket to engine M10  
75 Nm  
mounting (nut)  
Engine mounting to en‐  
gine carrier (bolt)  
M10  
M12  
60 Nm  
1
Engine carrier to body  
100 Nm + / turn (180°).  
2
(bolt)  
Drive shafts to gearbox  
⇒ Running gear, axles, steer‐  
ing - front and four-wheel  
drive; Rep. gr. 40 ; Repairing  
drive shaft  
Gearbox carrier to body  
Drive shafts to gearbox  
⇒ Differential and final drive;  
Rep. gr. 34 ; Installing gear‐  
box carrier and console .  
⇒ Running gear, axles, steer‐  
ing; Rep. gr. 40 ; Front wheel  
suspension  
12  
Rep. gr.10 - Removing and installing engine