Advertisement

Advertisement

Injection -> Siemens Injection Pump for Your Citroen Xsara SUV Second Generation (1997-2006)

CHECKS : TURBO PRESSURE  
XSARA - XSARA PICASSO  
Engine : RHZ  
Tools.  
[1] Pressure gauge for checking boost pressure  
[2] Sleeve for checking boost pressure  
[3] Adaptor sleeve  
: 4073-T.A Tool kit 4073-T  
: 4185-T  
: 4229-T  
Checks.  
IMPERATIVE : respect the following checking requirements : Engine at running  
temperature. Vehicle in running order at full load.  
Preparation.  
- Remove the collar fixing (3).  
- Insert the tool [2] connected with tool [3], between the pipe (1) and the duct (2).  
- Position tool [1] in the vehicle.  
- Connect the sleeve [2] to the tool [1] with its tube "a".  
Procedure.  
- Start the engine.  
- Engage first gear and start the engine.  
- Engage the gears up to third gear.  
- Decelerate to 1000rpm.  
- Accelerate hard, and check the pressure : 0.6 ± 0.05 Bar (1500 rpm).  
- Accelerate freely in kick-down, (changing from fourth to third gear).  
- Check the pressure : 0.95 ± 0.05 Bar (between 2500 and 3500 rpm).  
- Remove the tools, reposition the pipe (1) and refit the collar (3).  
B1HP12JD  
147  
Downloaded from www.Manualslib.com manuals search engine  
XSARA - XSARA PICASSO  
CHECKS : TURBO PRESSURE  
Engines : RHY  
TOOLS.  
[1] Pressure gauge for checking boost pressure  
[2] Sleeve for checking boost pressure  
: 4073-T.A Tool kit 4073-T  
: 4185-T  
Checks.  
IMPERATIVE : respect the following checking requirements : Engine at running tempe-  
rature. Vehicle running at full load.  
Preparation.  
- Remove the collar (3) and the sleeve.  
- Insert the tool [2] between the pipe (1) and the duct (2).  
- Position tool [1] in the vehicle.  
- Connect the pressure gauge [1] to the tool [2] with its tube "a" long enough for the gauge to  
be positioned inside the vehicle.  
Procedure.  
- Start the engine.  
- Engage first gear and start the engine.  
- Engage the gears up to third gear.  
- Decelerate to 2000 rpm.  
- Gradually accelerate.  
- Check the pressure : 0.95 ± 0.05 Bar.  
- Remove the tools, refit the collars (3) and the sleeve.  
B1BP1ZXD  
148  
Downloaded from www.Manualslib.com manuals search engine