148
08
In the event of a breakdown
►ꢀ Switch on the ignition (without starting the
engine).
►ꢀ Wait around 1 minute and switch off the
ignition.
►ꢀ Operate the starter motor to start the engine.
If the engine does not start at the first attempt,
do not keep trying, but restart the procedure.
Assembling and placing the
triangle
Warning triangle
As a safety precaution, before leaving your
vehicle to set up and install the triangle, switch
on the hazard warning lamps and put on your high
visibility vest.
Storage
Tool kit
Set of tools supplied with the vehicle.
Its content depends on your vehicle's equipment:
– Temporary puncture repair kit.
– Spare wheel.
For versions supplied with a triangle as original
equipment, refer to the illustration above.
For other versions, refer to the assembly
instructions provided with the triangle.
►ꢀ Put the triangle in place behind the vehicle, as
required by local legislation.
Access to the tools
Depending on version, the tool kit is stored in a
bag or in a storage box in the boot.
Use the straps on the boot sill trim to stow the
folded triangle or its storage box.
Running out of fuel
(Diesel)
With Diesel engines, the fuel system must be
primed if you run out of fuel.
Before starting to prime the system, it is essential
to put at least 5 litres of Diesel into the fuel tank.
On the boot carpet
For more information on Refuelling and on
Misfuel prevention (Diesel), please refer
to the corresponding section.