Audi A1 2011 ➤ , Audi A1 Sportback 2018 ➤ , Audi A2 2001 ➤ , Audi A3 20 ...
Electrical Equipment General Information - Edition 08.2019
1 - Nut
❑ 65 Nm
2 - Ribbed Belt Pulley
3 - Generator
4 - Voltage Regulator
❑ Removing and instal‐
ling. Refer to
⇒ “4.6 Voltage Regula‐
tor, Removing and In‐
stalling, Bosch Genera‐
tor from 2007”,
page 64 .
❑ Carbon brushes, check‐
ing. Refer to
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
⇒ “4.7 Carbon Brushes,
Checking, All Bosch
Generators from 2001”,
page 65
5 - Bolt
❑ 1.5 Nm
6 - Cover
7 - Bolt
❑ 3 Nm
8 - Bolt
❑ 2.5 Nm
4.6
Voltage Regulator, Removing and In‐
stalling, Bosch Generator from 2007
Removing
– Remove the generator. Refer to ⇒ Electrical Equipment; Rep.
Gr. 27 ; Generator; Generator, Removing and Installing .
– Remove the bolts -arrows-.
– Remove the cover -1- on the rear side of the generator.
64
Rep. Gr.27 - Starter, Generator and Cruise Control